Mar. 2023 Apr. 2020 Pump Station 1 SWL 6.95 MTRS PWL 12.8 MTRS SWL 6.95 MTRS PWL 12 MTRS Pump Station 2 SWL 13 MTRS PWL 19.8 MTRS SWL 13 MTRS PWL 21 MTRS Pump Station 3 SWL 8 MTRS PWL 13 MTRS SWL 7.50 MTRS PWL 19.50 MTRS Pump Station 4 SWL 14 MTRS PWL 20.40 MTRS SWL 13.8 MTRS PWL 20 MTRS Pump Station 5 SWL 6 MTRS PWL 16.5 MTRS SWL 6 MTRS PWL 16 MTRS Pump Station 6 SWL 4.60 MTRS PWL 6.20 MTRS SWL 4.60 MTRS PWL 7 MTRS
Pumping Station 1 of 2 Craser., Pob. South
Pumping Station 1 – Craser, Pob. South
Pump Station No. 1 – Craser, Polanco, Z.N. WELL: Bore Hole – 16 inches Depth – 72 mtrs Casing – 10 inches Spiral Welded Steel Casing Perforation – Stainless Steel Wire Wound Screen Well Capacity – 32 LPS Static Water Level – 5 mtrs PUMP: -> DYNA FlO No. of Bowls – 4 Discharge – 230 GPM Diameter – 3 inches Effeciency – Setting – 18 mtrs MOTOR -> FRANKLIN ELECTRIC MOTOR, 15 HP 230 volts 60 H2 DATE OF OPERATION: DECEMBER 22, 1995 OPERATION HOURS/DAY = 16 Hrs. PRODUCTION IN CU.M/DAY = 1,016 cu.m MOTOR CONTROLLER: 20 HP AUTOTRANSFORMER ->230 VOLTS, 3 PHASE GRAVEL PACK LEVEL: 15 MTRS
Pumping Station 2 – Conacon, Pob. North
Pumping Station -2 of 2 – Conacon, Pob. North
PUMP STATION 2 – Conacon, Polanco, Z.N. WELL: Bore Hole – 16 inches Depth – 80 mtrs Casing – 8 inches Spiral Welded Steel Casing Perforation – Stainless Steel Wire Wound Screen Well Capacity – 15 LPS Static Water Level – 11.65 mtrs PWL : 20.55 PUMP: ->SHAKTI PUMP No. of Bowls – 15 Discharge – 15 LPS Diameter – 5 inches Effeciency – 64% Setting – 31 mtrs MOTOR: -> FRANKLIN ELECTRIC MOTOR 15 HP 230 VOLTS 60 HZ DATE OF OPERATION: December 1, 2008 OPERATING HOURS/DAY = 17 HOURS PRODUCTION IN CU.M/DAY = 694.80 CU.M MOTOR CONTROLLER: 15 HP AUTOTRANSFORMER ->230 VOLTS, 3 PHASE GRAVEL BACK LEVEL : 15.60 MTRS
Pumping Station 3 of 2 – Sinanga, Anastacio
Pumping Station 3 – Sinanga, Anastacio
PUMP STATION 3 – Sinanga, Anastacio, Polanco, Z.N. WELL: Bore Hole – 16 inches Depth – 102 mtrs Casing – 8 inches Spiral Welded Steel Casing Perforation – Stainless Steel Wire Wound Screen Well Capacity – 20 LPS Static Water Level – 7 mtrs PUMP: ->DYNA-FLO PUMP No. of Bowls – 4 Discharge – 20 LPS Diameter – 4 inches Setting – 23 mtrs MOTOR: -> FRANKLIN ELECTRIC MOTOR 20 HP 230 VOLTS 60 HZ DATE OF OPERATION: December 6, 2008 OPERATING HOURS/DAY = 2 HOURS PRODUCTION IN CU.M/DAY = 108 CU.M MOTOR CONTROLLER: 20 HP AUTOTRANSFORMER ->230 VOLTS, 3 PHASE GRAVEL BACK LEVEL : 16.50 MTRS
Pumping Station 4 – Sinanga, Obay
Pump Station 4 – Sinanga, Obay
Pumping Station 5 – Labrador
Pumping Station 5 of 2- Labrador
PUMP STATION 5 – Sinanga, Obay, Polanco, Z.N. WELL: Bore Hole – 16 inches Depth – Casing – 8 inches Spiral Welded Steel Casing Perforation – Stainless Steel Wire Wound Screen Well Capacity – Static Water Level – 7 mtrs PUMP: No. of Bowls – 6 Discharge – 15 LPS Efficiency – Setting – 27 mtrs MOTOR: -> FRANKLIN ELECTRIC MOTOR 25 HP 230 VOLTS 60 HZ DATE OF OPERATION: February 2020 OPERATING HOURS/DAY = PRODUCTION IN CU.M/DAY = MOTOR CONTROLLER: 25 HP AUTOTRANSFORMER ->230 VOLTS, 3 PHASE GRAVEL PACK LEVEL : 14.50 MTRS
Pumping Station 6 of 2– Maralag, Guinles
Pumping Station 6 – Maralag, Guinles
PUMP STATION 6 – Maralag, Guinles, Polanco, Z.N. WELL: Bore Hole – 16 inches Depth – Casing – 8 inches Spiral Welded Steel Casing Perforation – Stainless Steel Wire Wound Screen Well Capacity – Static Water Level – PUMP: No. of Bowls – 6 Discharge – 18 LPS Efficiency – Setting – MOTOR: -> FRANKLIN ELECTRIC MOTOR 15 HP 230 VOLTS 60 HZ DATE OF OPERATION: September 2020 OPERATING HOURS/DAY = 10 Hrs PRODUCTION IN CU.M/DAY = 187 cu.m MOTOR CONTROLLER: 15 HP VFD MOTOR CONTROLLER ->230 VOLTS, 3 PHASE GRAVEL PACK LEVEL : 14.30 MTRS
50 cu.m. cap. Ground Concrete Reservoir – Bandera
100 cu.m Cap, Ground Concrete – Lingasad
100 cu.m Cap. Ground Concrete – Lapayanbaja
100 cu.m Cap. Ground Concrete – San Miguel
150 cu.m. cap. Elevated Steel Reservoir – Pob. South
PWADI Office Building and Equipments – Pob. South 2
PWADI Office Building and Equipments – Pob. South 3
PWADI Office Building and Equipments – Pob. South
PWADI Facilities