Mar. 2023Apr. 2020
Pump Station 1SWL 6.95 MTRS
PWL 12.8 MTRS
SWL 6.95 MTRS
PWL 12 MTRS
Pump Station 2SWL 13 MTRS
PWL 19.8 MTRS
SWL 13 MTRS
PWL 21 MTRS
Pump Station 3SWL 8 MTRS
PWL 13 MTRS
SWL 7.50 MTRS
PWL 19.50 MTRS
Pump Station 4SWL 14 MTRS
PWL 20.40 MTRS
SWL 13.8 MTRS
PWL 20 MTRS
Pump Station 5SWL 6 MTRS
PWL 16.5 MTRS
SWL 6 MTRS
PWL 16 MTRS
Pump Station 6SWL 4.60 MTRS
PWL 6.20 MTRS
SWL 4.60 MTRS
PWL 7 MTRS
Pump Station No. 1 – Craser, Polanco, Z.N.

WELL:
Bore Hole – 16 inches
Depth – 72 mtrs
Casing – 10 inches Spiral Welded Steel
Casing Perforation – Stainless Steel Wire Wound Screen
Well Capacity – 32 LPS
Static Water Level – 5 mtrs

PUMP:
-> DYNA FlO
No. of Bowls – 4
Discharge – 230 GPM
Diameter – 3 inches
Effeciency –
Setting – 18 mtrs

MOTOR
-> FRANKLIN ELECTRIC MOTOR, 15 HP
230 volts
60 H2

DATE OF OPERATION: DECEMBER 22, 1995
OPERATION HOURS/DAY = 16 Hrs.
PRODUCTION IN CU.M/DAY = 1,016 cu.m

MOTOR CONTROLLER:
20 HP AUTOTRANSFORMER
->230 VOLTS, 3 PHASE

GRAVEL PACK LEVEL: 15 MTRS

PUMP STATION 2 – Conacon, Polanco, Z.N.

WELL:
Bore Hole – 16 inches
Depth – 80 mtrs
Casing – 8 inches Spiral Welded Steel
Casing Perforation – Stainless Steel Wire Wound Screen
Well Capacity – 15 LPS
Static Water Level – 11.65 mtrs
PWL : 20.55

PUMP:
->SHAKTI PUMP
No. of Bowls – 15
Discharge – 15 LPS
Diameter – 5 inches
Effeciency – 64%
Setting – 31 mtrs

MOTOR:
-> FRANKLIN ELECTRIC MOTOR 15 HP
230 VOLTS
60 HZ

DATE OF OPERATION: December 1, 2008
OPERATING HOURS/DAY = 17 HOURS
PRODUCTION IN CU.M/DAY = 694.80 CU.M

MOTOR CONTROLLER:
15 HP AUTOTRANSFORMER
->230 VOLTS, 3 PHASE

GRAVEL BACK LEVEL : 15.60 MTRS

PUMP STATION 3 – Sinanga, Anastacio, Polanco, Z.N.

WELL:
Bore Hole – 16 inches
Depth – 102 mtrs
Casing – 8 inches Spiral Welded Steel
Casing Perforation – Stainless Steel Wire Wound Screen
Well Capacity – 20 LPS
Static Water Level – 7 mtrs

PUMP:
->DYNA-FLO PUMP
No. of Bowls – 4
Discharge – 20 LPS
Diameter – 4 inches
Setting – 23 mtrs

MOTOR:
-> FRANKLIN ELECTRIC MOTOR 20 HP
230 VOLTS
60 HZ

DATE OF OPERATION: December 6, 2008
OPERATING HOURS/DAY = 2 HOURS
PRODUCTION IN CU.M/DAY = 108 CU.M

MOTOR CONTROLLER:
20 HP AUTOTRANSFORMER
->230 VOLTS, 3 PHASE

GRAVEL BACK LEVEL : 16.50 MTRS

PUMP STATION 5 – Sinanga, Obay, Polanco, Z.N.

WELL:
Bore Hole – 16 inches
Depth –
Casing – 8 inches Spiral Welded Steel
Casing Perforation – Stainless Steel Wire Wound Screen
Well Capacity –
Static Water Level – 7 mtrs

PUMP:
No. of Bowls – 6
Discharge – 15 LPS
Efficiency –
Setting – 27 mtrs

MOTOR:
-> FRANKLIN ELECTRIC MOTOR 25 HP
230 VOLTS
60 HZ

DATE OF OPERATION: February 2020
OPERATING HOURS/DAY =
PRODUCTION IN CU.M/DAY =

MOTOR CONTROLLER:
25 HP AUTOTRANSFORMER
->230 VOLTS, 3 PHASE

GRAVEL PACK LEVEL : 14.50 MTRS

PUMP STATION 6 – Maralag, Guinles, Polanco, Z.N.

WELL:
Bore Hole – 16 inches
Depth –
Casing – 8 inches Spiral Welded Steel
Casing Perforation – Stainless Steel Wire Wound Screen
Well Capacity –
Static Water Level –

PUMP:
No. of Bowls – 6
Discharge – 18 LPS
Efficiency –
Setting –

MOTOR:
-> FRANKLIN ELECTRIC MOTOR 15 HP
230 VOLTS
60 HZ

DATE OF OPERATION: September 2020
OPERATING HOURS/DAY = 10 Hrs
PRODUCTION IN CU.M/DAY = 187 cu.m

MOTOR CONTROLLER:
15 HP VFD MOTOR CONTROLLER
->230 VOLTS, 3 PHASE

GRAVEL PACK LEVEL : 14.30 MTRS